92kw 2200rpm Well Drilling Rig 350m For Deep Underground Water Wells
92kw borehole drilling machine
,92kw water well drilling rig
,350m borehole drilling machine
The ST 350 power system is hydraulically driven by a diesel engine. The dashboard is simple and clear, and it features a crawler-mounted structure for easy mobility. The rig utilizes a steel crawler chassis (with optional rubber crawlers for urban road use), four standard high legs, optimized hydraulic cylinders for enhanced reliability, and an inclined guide rail installation for easier operation and observation. The housing uses thickened profiles, and an additional ring provides convenient handling and lifting.
| Parameter | Specification |
|---|---|
| Drilling Rig Model | ST 350 Well Drilling Rig |
| Drilling Depth | 350m |
| Hole Diameter | φ140-325mm |
| Advance Length (one time) | 6.6m |
| Working Pressure | 1.7-3.0MPa |
| Air Consumption | 17-35m³/min |
| Length of Rod | 1.5m, 2m, 3m, 6m |
| Diameter of Rod | φ76, φ89, φ102, φ114 |
| Lifting Power | 24T |
| Rotation Torque | 8500-11000N.m |
| Rotation Speed | 40-70r/min |
| Diesel Engine | Yuchai |
| Engine Power | 92Kw/2200rpm |
| Travelling Speed | 0-2.5 Km/h |
| Climb Capacity | 30° |
| Weight | 9500kgs |
| Dimension | 6000x2200x2900mm |
| Application | Complicated geological conditions: Rock, Mud, Sand etc. |
| Drilling Way | Top drive hydraulic rotary and propulsion, DTH Drilling or Mud Pump Drilling |
| DTH Hammer | 4", 5", 6", 8", 10" Drill hammer or CIR110, 130, 150, 170 |
- High slag discharge wind speed ensures clean hole bottom with no secondary crushing; absence of liquid column pressure improves hole bottom crushing conditions without groundwater interference
- High-frequency impact drilling method reduces the influence of hole inclination on rock or inclined strata, improving drilling verticality and reducing rock collapse of hole walls
- Requires significantly less weight on bit and torque compared to rotary well drilling rigs, reducing equipment mass and capacity while enabling large-diameter hard rock drilling
- Excellent adaptability to work under various complex rock strata, including aquifers
- Simple structure with convenient use and maintenance
After well completion, measure the water level and corresponding water output according to drilling machine drainage conditions. Determine the total head of the water pump based on the height difference from ground to dynamic water level and your irrigation method requirements. The water pump flow should not exceed the well's water flow capacity. Purchase the appropriate water pump based on these two criteria.
- Determine machine log length, quantity, and foundation type based on equipment type, drilling design angle, depth, and regional conditions
- Ensure stable, square, and horizontal layout for all machine bases (wooden, channel steel, or I-beam) with proper washers and tightened nuts for enhanced bearing capacity and equipment stability
- For deep pit construction with unstable foundation rock layers, pour concrete foundations for drilling tower legs, drilling rig, power machine, and lower excavation pit
- Installation sequence: drilling rig (intermediate shaft), power machine, mud pump, and other auxiliary equipment
- Integrate drilling rig and power machine base bolts with machine bed wood and machine sleeper intersections
- Align crown block center (or leading edge), vertical shaft center (or rotary table center), and drilling hole center in a straight line
- For belt-driven systems, ensure proper distance between components and aligned belt pulleys
- Equip all equipment and auxiliary equipment bolts with washers and tighten properly
- Organize team inspection and acceptance after installation completion; commence drilling only after meeting installation quality and safety protection requirements
Pneumatic Drilling Rig / Air Drilling Rig (ST-180, ST-200, ST-260, ST-300, ST-350, ST-400, ST450, ST-450, ST-500, ST-600, ST-800 and other Pneumatic water well drilling Rigs), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig (ST-30, ST-50, XY-1A, XY-1B, XY-2, XY-2B, GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines), Crawler Track Undercarriage, Drilling Mud Pump (BW150, BW160, BW200, BW250, BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits (PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts (drilling rods, drilling rods joint, casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter
-
Water Well And Exploration Rock Core Drilling Equipment With Mud Pump
XY-1 Rock Core Drilling Equipment with BW 160 mud pump. Diesel engine, max 120m depth, 42mm rod diameter, 75-200mm drilling range. Steel construction, field-proven for exploration, mining, and construction. Cost-effective solution with common spare parts for overseas sites. -
50 Meters Depth Hydraulic Borewell Machine With 2 Wheels
ST 50 Hydraulic Borewell Machine: 50m drilling depth, 75mm hole diameter, lightweight with 2 wheels for easy transport. Ideal for geological exploration, soil testing, and core sampling in plains, mountains, and remote areas. Compact, centralized controls, and optional colors. -
Advanced Pneumatic Well Drill Rig Fast Lifting Speed Of 0-30 M/Min
Advanced Pneumatic Well Drill Rig with 0-30 m/min fast lifting speed. Features 3000 Nm rotary torque, 100-150m drilling depth, 2.5 km/hour mobility, and robust alloy steel construction. Ideal for water well drilling with high efficiency and reliability.