200m Trailer Mounted Drilling Rig Full Hydraulic DTH Water Drilling Machines For Sale
200m trailer mounted drilling rig
,dth water drilling machines for sale
,trailer mounted drilling rig full hydraulic
200m Trailer Mounted Full Hydraulic DTH Water Drilling Machines For Sale
GK 200 Water Well Drilling Rig brief introduction
Multi-functional trailer mounted water well drilling rig is a efficient,multi-function full hydraulic water welldrilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
Specification for GK200 water well drilling rig
| Drilling Rig Specifications | |
|---|---|
| Drilling diameter (mm) | 75, 91, 110, 130, 150, 300 |
| Drilling depth (m) | 200, 150, 100, 70, 50, 30 |
| Drill pipe diameter (mm) | 42, 50 |
| Drilling angle (°) | 90~75 |
| Equipment size (L × B × H) | 1730 × 860 × 1360 (mm) |
| Rig weight (except engine) | 700 kg |
| Gyrator Specifications | |
| Spindle speed (four gear) (r/min) | 115, 230, 505, 1010 |
| Spindle travel (mm) | 450 |
| Spindle no-load lifting maximum moving speed (m/s) | 0.05 |
| Spindle no load drop maximum movement speed (m/s) | 0.067 |
| Spindle maximum feed pressure (KN) | 15 |
| Spindle maximum lifting force (KN) | 25 |
| Spindle maximum output torque (KN•m) | 1.5 |
Usage of the GK200 Water well drilling rig
1. General investigation, geophysical exploration, high-way and building construction,Blast-hole drilling etc.
2. With hydro-automatic feeding device, and high drilling efficiency
3. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
4. Close levers, convenient to operate, safe and reliable operations.
5. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas.
Today I will tell you about the measures taken during the running-in period of the water well drilling rig.
1. Pay attention to the working load during the running-in period. The working load during the running-in period should not exceed 80% of the rated working load, and appropriate workload should be arranged to prevent overheating caused by the continuous operation of the machine for a long time.
2. Pay attention to observe the indication of each instrument frequently. In case of any abnormality, stop the vehicle in time to eliminate it
3. Attention should be paid to strengthen the lubrication of each lubricating point. It is recommended that lubricating grease should be added to the lubricating point every shift during the running-in period (except for special requirements).
4. Pay attention to keep the machine clean and timely adjust and fasten loose parts.
5. At the end of the running-in period, the machine shall be subject to compulsory maintenance, inspection and adjustment, and attention shall be paid to the replacement of oil.
In short, the requirements for the use and maintenance of water well drilling rig during the running-in period can be summarized as follows: reduce the load, pay attention to inspection and strengthen lubrication. As long as you pay attention to and implement the maintenance and maintenance of construction machinery during the running-in period as required, you will reduce the occurrence of early failures, extend the service life, improve the operation efficiency, and bring more economic benefits to you.








Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:
Pneumatic Drilling Rig / Air Drilling Rig(ST-180,ST-200,ST-260,ST-300,ST-350,ST-400,ST450,ST-450,ST-500, ST-600,ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B,GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter
-
High‑efficient Gear Transmission Underground Diamond Core Drill Rigs For Various Soil And Rock Formations
XY-1 Underground Diamond Core Drill Rig delivers high-speed drilling up to 120m depth in various soil/rock formations. Features steel construction, hydraulic system, BW 160 mud pump, diesel engine, and 12-month warranty. Lightweight (600kg) for easy transport with minimal maintenance. -
Lightweight Hydraulic Borewell Machine With Hoist SPT
GK 200 Hydraulic Borewell Machine is a lightweight, portable borehole drilling rig machine that is perfect for drilling boreholes for water and gas supply. It is easy to transport and use in a variety of different drilling applications. With a drilling diameter of 300mm, a weight of 600 Kg and a lifting force of 15KN, GK 200 Hydraulic Borewell Machine is highly efficient and reliable. -
Small 15kw Hydraulic Borewell Machine With Max 300mm Diameter
Small 15kw Hydraulic Borewell Machine with max 300mm diameter. Features 200m depth capacity, hydraulic feed system, wheeled mobility, and pressure gauge monitoring. Ideal for water well drilling, soil testing, and exploration applications with 16.5KW diesel power.