Impactor Borewell Drilling Rig Pneumatic Drilling Equipment 200m Depth For Borehole Blasting
impactor borewell drilling rig
,pneumatic drilling equipment 200m
,pneumatic drilling equipment 200m depth
High quality, competitive price pneumatic drilling rig with 200m drilling depth, crawler assembly, and powerful performance. Designed for various terrains with stable operation and flexible volume. Driven by hydraulic motor with large traction. Available in various models with support for customization. Especially suitable for water intake in mountainous and rocky strata.
| Drilling Rig Model | ST-200 |
|---|---|
| Weight | 5.8T |
| Bore diameter | 140-305mm |
| Drilling depth | 200m |
| Stroke | 3.4m |
| Travelling speed | 2.5km/h |
| Gradeability | 30% |
| Power | 65-70KW |
| Rated pressure | 1.7-3.0mpa |
| Air consumption | 17-30m³/min |
| Drill rod diameter | Φ76, Φ89 |
| Drill rod length | 1.5m 2.0m 3.0m |
| Elevating capacity | 15T |
| Swing speed | 45-70rpm |
| Swing torque | 3500-4800N.M |
| Dimensions | 4000*1750*2450mm |
- Small profile for easy access to narrow job sites
- Simple but reliable design with adequate rotary torque and lifting force for civilian market applications
- Hoist and winch able to lift drill tools and accessories up to 1,500kg, significantly reducing operator workload
- Rotation with two speed adjustable for different hole ranges and rock conditions
- Before sales: Engineering Consultance Service & Technical Support
- After sales: Process clients' feedback and problems during machine operation within 24 hours
- OEM service: Accept OEM orders with 70% of clients enjoying OEM services
- The length, quantity, and foundation type of various machine logs should be determined based on equipment type, drilling design angle, depth, and regional conditions
- Regardless of using wooden bases, channel steel, or I-beam machines, layout requirements are stable, square, and horizontal. Cross connecting bolts should be equipped with washers and tightened with nuts to increase foundation bearing capacity and equipment stability
- In deep pit construction, if foundation rock layer is not firm, concrete foundation should be poured into the four legs of the drilling tower, drilling rig, power machine, and lower excavation pit
- The installation sequence of drilling equipment is the drilling rig (intermediate shaft), power machine, mud pump, and other auxiliary equipment
- The bolts of the drilling rig and power machine base are integrated with the intersection of the machine bed wood and machine sleepers
- Install the drilling rig so that the center of the crown block (or leading edge), the center of the vertical shaft (or center of the rotary table), and the center of the drilling hole are in a straight line
- When installing the intermediate shaft, power machine, and mud pump, if belt transmission is used, the distance between each part should be appropriate, and the belt pulley should be aligned
- The installation of bolts for various equipment and auxiliary equipment must be equipped with washers and tightened
- After installation completion, the team must organize relevant personnel for inspection and acceptance. Only after installation quality and safety protection devices meet requirements can drilling be started

Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:
Pneumatic Drilling Rig / Air Drilling Rig(ST-180,ST-200,ST-260,ST-300,ST-350,ST-400,ST450,ST-450,ST-500, ST-600,ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B,GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter
-
Water Well And Exploration Rock Core Drilling Equipment With Mud Pump
XY-1 Rock Core Drilling Equipment with BW 160 mud pump. Diesel engine, max 120m depth, 42mm rod diameter, 75-200mm drilling range. Steel construction, field-proven for exploration, mining, and construction. Cost-effective solution with common spare parts for overseas sites. -
0-200mm Hole Diameter Hydraulic Borewell Machine For Global Trade
XY-1A Hydraulic Borewell Machine: Diesel-powered rig with 150m drilling depth, 0-300mm diameter. Features 16.2kW power, 30-1050r/min spindle speed, and 90-75° angle range. Ideal for water wells, soil testing, and geological surveys. Offers 15-20% lower fuel consumption and quick-change tooling for reduced downtime. -
2.8T Water Drilling Equipment Rig Advanced Technology For Drilling Performance
2.8T self-propelled water well drilling rig with 100m depth capacity. Features compact design (4000*1600*2680), 2.5Km/h movement speed, 76mm rod hole, and flexible power (electric/diesel). ISO/CE certified with custom color options.