Impactor Borewell Drilling Rig Pneumatic Drilling Equipment 200m Depth For Borehole Blasting

Product Summary
ST 200 Pneumatic Drilling Rig: 200m depth, crawler mobility, hydraulic feeding, 140-200mm drilling diameter. Features small profile for narrow sites, reliable design with 3500-4800N.M torque, and OEM customization support.
Basic Properties
Place of Origin: China
Brand Name: ShiTan
Certification: ISO
Model Number: ST200
Trading Properties
Minimum Order Quantity: 1 set
Price: USD46000/set
Payment Terms: T/T,Western Union
Supply Ability: 2000sets/month
Product Details
Highlight:

impactor borewell drilling rig

,

pneumatic drilling equipment 200m

,

pneumatic drilling equipment 200m depth

Drilling Rig Product Name: ST 200 Pneumatic Drilling Rig
Drilling Depth: 200 Meters
Drilling Diameter: 140-200mm
Drilling Type: Water Well Drilling
Mobility: Crawler
Drilling Unit: Tophammer
Feeding Type: Hydraulic
Drill Rod Diameter: 76/89
Swing Speed: 45-70rpm
Swing Torque: 3500-4800N.M
Drill Rod Length: 1.5m 2.0m 3.0m
OEM: Acceptable
Product Description
Impactor Borewell Pneumatic Drilling Rig With 200m Depth For Borehole Blasting
ST-200 Pneumatic Drilling Rig Introduction

High quality, competitive price pneumatic drilling rig with 200m drilling depth, crawler assembly, and powerful performance. Designed for various terrains with stable operation and flexible volume. Driven by hydraulic motor with large traction. Available in various models with support for customization. Especially suitable for water intake in mountainous and rocky strata.

ST-200 Pneumatic Drilling Rig Parameters
Drilling Rig Model ST-200
Weight 5.8T
Bore diameter 140-305mm
Drilling depth 200m
Stroke 3.4m
Travelling speed 2.5km/h
Gradeability 30%
Power 65-70KW
Rated pressure 1.7-3.0mpa
Air consumption 17-30m³/min
Drill rod diameter Φ76, Φ89
Drill rod length 1.5m 2.0m 3.0m
Elevating capacity 15T
Swing speed 45-70rpm
Swing torque 3500-4800N.M
Dimensions 4000*1750*2450mm
ST-200 Pneumatic Drilling Rig Features
  • Small profile for easy access to narrow job sites
  • Simple but reliable design with adequate rotary torque and lifting force for civilian market applications
  • Hoist and winch able to lift drill tools and accessories up to 1,500kg, significantly reducing operator workload
  • Rotation with two speed adjustable for different hole ranges and rock conditions
ST-200 Pneumatic Drilling Rig Service
  • Before sales: Engineering Consultance Service & Technical Support
  • After sales: Process clients' feedback and problems during machine operation within 24 hours
  • OEM service: Accept OEM orders with 70% of clients enjoying OEM services
Specific Requirements for Drilling Equipment Installation
  1. The length, quantity, and foundation type of various machine logs should be determined based on equipment type, drilling design angle, depth, and regional conditions
  2. Regardless of using wooden bases, channel steel, or I-beam machines, layout requirements are stable, square, and horizontal. Cross connecting bolts should be equipped with washers and tightened with nuts to increase foundation bearing capacity and equipment stability
  3. In deep pit construction, if foundation rock layer is not firm, concrete foundation should be poured into the four legs of the drilling tower, drilling rig, power machine, and lower excavation pit
  4. The installation sequence of drilling equipment is the drilling rig (intermediate shaft), power machine, mud pump, and other auxiliary equipment
  5. The bolts of the drilling rig and power machine base are integrated with the intersection of the machine bed wood and machine sleepers
  6. Install the drilling rig so that the center of the crown block (or leading edge), the center of the vertical shaft (or center of the rotary table), and the center of the drilling hole are in a straight line
  7. When installing the intermediate shaft, power machine, and mud pump, if belt transmission is used, the distance between each part should be appropriate, and the belt pulley should be aligned
  8. The installation of bolts for various equipment and auxiliary equipment must be equipped with washers and tightened
  9. After installation completion, the team must organize relevant personnel for inspection and acceptance. Only after installation quality and safety protection devices meet requirements can drilling be started
ST-200 Pneumatic Drilling Rig operational view ST-200 Pneumatic Drilling Rig side view ST-200 Pneumatic Drilling Rig front view ST-200 Pneumatic Drilling Rig detailed components ST-200 Pneumatic Drilling Rig in operation ST-200 Pneumatic Drilling Rig technical specifications

Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:

Pneumatic Drilling Rig / Air Drilling Rig(ST-180,ST-200,ST-260,ST-300,ST-350,ST-400,ST450,ST-450,ST-500, ST-600,ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B,GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter

Mrs. Anna

Manager

Related Products
  • Geological Exploration Hydraulic Core Drilling Machine With Fast Drilling Speed

    GK200 Hydraulic Core Drilling Machine delivers fast drilling speeds up to 200m depth with 22HP diesel engine. Compact design (525KG) for easy transport and quick setup. Features 5 spindle speeds (115-1010 r/min) and handles 91-300mm diameters for geological exploration and water wells.
  • 30m-100m Drill Depth Crawler Water Well Drilling Rig Equipped With Diesel Engine

    Small 100 Meter Crawler Mounted Drilling Rig Machine with 30-100m drilling depth, diesel engine power, and 80r/min rotation speed. Compact size (2000*1200*1200mm) with 1.5m drill pipes. Suitable for water wells, soil investigation, and geological drilling. Custom colors available with 10-day delivery.
  • Large Diameter Hydraulic Borewell Machine With 300KN Winch Lifting Force

    XY-2B Hydraulic Borewell Machine with 300KN winch force drills 500m deep, 400mm diameter boreholes. Features modular design for easy transport, dual gear hydraulic pump resistant to overheating, and multi-speed rotary head compatible with Southeast Asian formations. Factory-direct pricing with universal spare parts.
Send an Inquiry